Tubing Completions

All info Description Specifications Attachments Reviews
Tubing Completions
Tubing Completions
Tubing Completions
Tubing Completions
As configured
$2,640.00

Configure your product

Style
Bottom Prep
Bottom Flange
Top Flange
Outlet
Material Class
Temperature Rating
SKU
P1000156627

Delivery options

Warehouse
Prices in warehouses can differ.
Need assistance?
You can call us directly at (281) 206-4175 7 days a week, 7AM–6PM CST

Description

Due to supply chain cost increases, a surcharge may be added at checkout.

Offering our customers a practical and flexible well solution

TechnipFMC’s Tubing Completion ( TC ) series provides a versatile, standard, and comprehensive set of components to suit a broad range of well completion configurations for onshore and offshore applications. The completion is the process of making a well ready for production including installation of the tubing head, tubing hanger, and production tree with the tubing head adapter.

The TC series of tubing heads and tubing hangers offers:

  • A safe, reliable and low CAPEX solution for nominal 7 1/1 6-inch through 13 5/8-inch
  • Available for 2,000 psi to 20,000 psi working pressure between -75° F to 350° F
  • Hanger retention with internal latch or lockdown screws
  • Tubing heads in four basic styles; differences in the number and type of aligning pins
  • Trouble free installation using minimal tool package
  • Lower profile configured with elastomer or Rough Casing Metal Seal (RCMS)
  • Accept all bowl profile, including single and dual tubing hangers
  • Key technology qualified to API 6A , including PR2F, performance requirements
  • Low cost product with fast availability and global supply through local stocking programs


The TC series of tubing heads offers:

  • Available in standardized, simple and robust wrap around TC1-W to full metal-to-metal sealing TC-1A-EMS
  • Continuous or non-continuous control lines
  • Primary sealing can be elastomer or metal-to-metal
  • Common bowl profile accepts all hanger types including duals (aligning pins required for TC-60 dual hanger)
  • Installation tooling simplified: Hangers run on tubing or a dedicated running/retrieving tool
  • Group 5 hangers configured with a back pressure valve profile

*The product images shown are for illustration purposes only and may not be an exact representation of the product.

Specifications

Product Description TUBING HEAD ASSY, TCM-ET, 9 3/4 BGS BTM PREP, 11-5K FLG BTM X 7 1/16-10K FLG TOP W/ TWO 1 13/16-10K STDD OUT, L7 BLTG, EE-0,5, K-U, PSL 2, MONOGRAMMED, W/ STEPPED BTM PREP
Item Weight (LB) 1152
Product Description TUBING HEAD ASSY, TCM-ET, 9 3/4 BGS BTM PREP, 11-5K FLG BTM X 7 1/16-10K FLG TOP W/ TWO 1 13/16-10K STDD OUT, L7 BLTG, EE-0,5, K-U, PSL 2, MONOGRAMMED, W/ STEPPED BTM PREP
Item Weight (LB) 1152

Attachments

Customer reviews

This product has not been reviewed or rated yet.